22500 sq.m.
Complete lighting control
Complete control of air conditioning and ventilation
Inspection of 22 ceiling air conditioners in terms of their operating point and heat recovery
Lock / release control and status display with alarm output of the peripheral doors of the building
1MW generator test
Visualization of the installation and its operation by the central control
CCTV system and local recording